RV 150 Ulven to sinsen (ring 3)
  • RV 150 Ulven in sinsen project image

RV 150 Ulven to sinsen (ring 3)

  • Project RV 150 Ulven - sinsen (ring 3)
  • Client Statens Vegvesen Region Øst
  • Contract Period 2008 – 2015
  • Services Mapping

Scope of Work

Assistance in construction management
Follow-up of contractor
Follow-up of engineering consultant

  • Follow-up of operation
  • Quality control of certificates, final phase
  • Geometric control
  • Delivery control for engineering consultants
  • Final documentation, management of map data to NVDB / FKB

The Project has Built

  • 1830 meter mountain tunnel
  • 1300 meter concrete tunnel
  • 9.5 km surface road
  • 2.6 km sidewalk and bicycle lanes
  • 2.1 km high-occupancy vehicle lanes
  • 232 meter new subway platform (Økern T-banestasjon)
  • 10 roundabouts
  • 2 underpasses for sidewalks and bicycle paths

Other

  • Pilot project in 3D-engineering
  • First project with engineering via Novapoint DCM19
  • Focus on traffic safety and effective traffic management

Related Projects